This project is a direct engagement with Electric Safety Authority. The project scope included purchasing the LED lighting, removing the existing fixtures, installing 276 new full-spectrum LED panels, and recycling old lamps. All work was performed in compliance with health and safety requirements. The project was completed ahead of schedule and within the assigned budget.
Albion Bolton Community Center
This project is a subcontracting engagement for Bolton Community Center to remove 803 fluorescent fixtures and replace them with energy-efficient LED influx lighting. Rusco Electric Services (RES) was responsible for the planning, project management, and execution of the project. RES performed the work with the highest level of quality, ensuring compliance with health and safety requirements. The project was completed on schedule and within budget.
Dorplex INdustries ltd
Rusco Electric Service (RES) was contracted to provide a complete upgrade of the warehouse lighting including indoor and outdoor fixtures. The project included insatiing and replacing over 450 fixtures. The RES technicians completed the project in accords with provided specifications and worked with the manufacturer to determined the required lighting specification for each area of the warehouse. The project was complete on time and within assigned budget.